Berl Report - The Incineration Option

In July 2019, Nick Robertson and Merewyn Groom completed a report on whether incineration was a waste disposal option for New Zealand.

The report acknowledged that the introduction of waste-to-energy (W-t-E) could affect New Zealand’s efforts to move to a circular economy at the time being considered by The Ministry for the Environment (MfE) to transition New Zealand toward reducing waste and associated pollutants, protect and restore natural capital, and help address issues including climate change and water quality. 

The report stated, “by creating an alternative to landfills, WtE could affect efforts to reduce the creation of waste, including reuse, recycling, and reprocessing. Despite being promoted by some as renewable energy or recycling, the European Commission have mapped various WtE methods against the waste hierarchy and found that this is not the case.”

Renew Energy Limited

At the time the report was being written, Renew Energy Limited (REL) had a proposal to build a waste-to-energy plant in Westport on the South Island’s West Coast.

The proposal was to incinerate 330,000 tonnes of commercial and industrial waste and generate up to 28MW of electricity. This included an alternative to also provide thermal energy for neighbouring development to utilise industrial heat, however, this alternative would reduce electricity export to around 18MW.

Benefits

The report acknowledged that a W-t-E facility could revive a struggling West Coast region with much needed employment. It also 
stated that incineration could play a part in waste management when effectively combined with sorting and recycling of recoverable materials.

Potential costs and negative effects.

The report also listed negative effects, including:

  • visual pollution from such
    a large industrial development and stockpiled feedstock in an area with relatively few such structures.
  • Waste incineration produces greenhouse gas and toxic emissions.
  • The importation of waste from other regions to fuel the plant.
  • Traffic effects due to the import of feedstock and removal of ash, presumably to a landfill outside of the district.

Many of the negative effects will depend on the management and maintenance of the facility. For
example, emissions mitigation requires strict monitoring and the feedstock will require proper bailing
and storage to avoid windblown waste escaping from the site.

REL's GHG emissions flawed

The report stated that Renew Energy had provided some information on facilities in operation overseas and information about the facility intended for the Buller District. However, details on the facility, the feedstock, and likely emissions were not provided.

Renew Energy did provide documentation to support their proposal’s greenhouse gas emissions. However, their comparisons against landfilling options were “skewed” to present “landfills as far worse than the New Zealand average and that all W-t-E plants operate at the lowest international emission rate.”

The report highlighted a significant oversight in Renew Energy’s comparison. They failed to account for landfill gas capture in New Zealand, while “presenting the lowest reported emissions from incineration in Denmark, a country with a waste management infrastructure far more developed than that of New Zealand.”

Toxic emissions

The report also highlighted the potential for W-t-E plants to release a range of toxic substances, with the type and amount varying according to feedstock, technologies, facility design and consent conditions to ensure toxins, including dioxins, furans, chlorides, and fine particulates, are effectively managed, with ongoing monitoring to ensure compliance. Ash, with the usual presence of heavy metals and toxins, must be disposed of in a hazardous waste landfill, which has measures to prevent the pollutants from leaching into the water table.

Effects of W-t-E on the waste market

The report stated that “conversations with industry participants which included waste companies, landfill owners,
recycling companies and local authorities made it clear that they see WtE, and in particular
incineration, as a direct substitute for landfills and that both options should be considered the last
resort. Participants believed WtE does not encourage waste minimisation or behaviour change. As a
result we have assumed that the choice of how to dispose of waste will be between landfill, recycling
and WtE.”

Disposal costs

The Berl report provided the following regarding disposal costs for incineration:

Renew Energy, who were promoting the proposed West Coast waste facility, were proposing a fee of $140 per tonne to bale waste, transport it from Canterbury (Christchurch) to the West Coast and then incinerate the waste at its WtE facility on the West Coast. The proposed service would bale waste in Christchurch at a facility close to the rail line where coal trains returning to the West Coast would be loaded with baled waste for the WtE facility. The gate fee component of this cost, the fee the WtE facility would charge, is $80 per tonne.

“We asked Renew Energy what the additional costs would be for transport from other locations in the South Island and were advised that in discussions with Marlborough District Council, it had recommended an additional $30 per tonne to cover the additional transport costs from Blenheim. It was not decided how this transport would be delivered.”

 

Berl reported that Eunomia also considered incineration as an option and found that “the principal reason [for not pursuing WtE] appears to be the relatively high cost compared to large-scale landfills.”

In 2012, Auckland Council commissioned a report by Campbell MacPherson into Energy from waste as a possible option for the City. Campbell MacPherson concluded, “There is no clear indication at this stage that economic drivers are in place to ensure the viability of WtE in the Auckland waste market”.

The study identified that combined capital and operating costs for a 200,000-tonne per annum incinerator would range between $140 and $210 per tonne. Campbell McPherson found that when taking account of income from electricity generation, this would indicate gate fees of between $100 and $170 per tonne would be required.

 

Berl also stated, “We spoke to one of the large waste companies that operate WtE facilities around the world, and it informed us that they had previously looked into WtE in New Zealand and found that the gate fee it would need to charge to be profitable in New Zealand was around $400 per tonne.

Representatives from the company said that if it were profitable to run a WtE facility in New Zealand, they would already be doing it as they already have the waste volumes available to support the facility.”

 

Berl also stated that the Marlborough District Council recently assessed the cost of providing current services if it switched to WtE with a projected gate fee of $160 per tonne (including baling and transport). Based on this assessment, the cost of the services offered by Marlborough District Council would all increase above the current expenses.

South Island landfill costs

Using the information in the Berl report, we can establish South Island landfill costs in 2019 and compare them to the $140 total fee and the $80 gate fee that Renew Energy proposed at the time. 

The Berl report stated:

  • Christchurch City disposes of waste at Kate Valley landfill, of which it owns a share. The price paid by those disposing of waste at an EcoDrop facility in Christchurch is $253.40 per tonne. This price includes the cost of handling, sorting, and transporting waste to the Kate Valley landfill and the gate fee for disposing of waste at the Kate Valley landfill. In 2016, the gate fee at Kate Valley was $107.91 per tonne.
  • For containerised transfer station waste. Kate Valley is not open to the public and can only be used by approved organisations. As Kate Valley is partially owned by the local authorities, the authorities receive a dividend from the landfill’s profits that goes back into council budgets.
  • The council-owned Bluegums landfill is the only landfill in Marlborough that can receive municipal solid waste (MSW). The gate fee at Bluegums is $132.20 per tonne for general refuse. This cost includes repayment of the capital investment, ongoing operations and maintenance, and aftercare costs once the landfill closes. The landfill also recovers a small profit for the local authority that is put towards council-run services.
  • The Victoria Flats landfill’s gate fee, which provides services to Queenstown Lakes District Council, is approximately $80 to $85 per tonne.

Eunomia reported in 2017 that “Waste disposal costs (i.e. bulk rates at the landfill) can vary significantly ($20- $190), but the average in New Zealand is determined to be in the order of $75 per tonne for active waste, and $10 per tonne for inert (cleanfill) waste. In comparison, recovery of putrescible material (e.g. food waste) can cost between $80- $160 per tonne, and processing of

construction and demolition materials can cost between $5-40 per tonne.”

Cost of recycling

The report highlighted the potential impacts a waste-to-energy facility may have on recycling. “Revenue received from the sale of recycled material and the collection and sorting of recyclables is a significant cost to waste companies and local authorities; recycling is often more costly than sending all waste to a landfill,” the report stated. 
One local authority commented that for low or nil recyclables, WtE could be a solution and reduce the financial risk to the local authority.
The report stated, “If the cost of WtE disposal is less than that of recycling, then there is a very likely possibility that there could be a reduction in the volume of materials recycled as unprofitable recycling is no longer sorted and is sent to cheaper disposal alternatives.”

Contract lengths

Existing contractual agreements may restrict any transition to WtE. Large waste companies, if financially incentivised, could change their disposal facilities. However, they are likely to continue using their own facilities unless WtE proves to be significantly more cost-effective. It’s important to note that the cost of landfill disposal, despite being low, includes the recovery of the investment made to establish the landfill and a return on investment for the landfill owner.
Kate Valley landfill can receive waste until 2040, meaning that the local authorities and Waste Management are unlikely to change before this time unless WtE is significantly cheaper than Kate Valley.
Queenstown Lakes District Council’s contract with the Victoria Flats landfill requires them to be the disposal location for waste collected by the local authority until 2029. This prevents the local authority from moving to a WtE facility before this time.

Volume of waste required

Eunomia (2017) found that a facility of 200,000 tonnes per annum or larger would likely be necessary for economic viability. It would need to be located near a large population centre to ensure sufficient feedstock (e.g., Auckland).
REL’s proposed facility for Buller had a capacity for 330,000 tonnes of waste. However, to break even or return a small profit, the facility would require approximately 250,000 tonnes per annum.
Christchurch City produced 217,503 tonnes of household and commercial waste in 2018, which alone would not be enough to ensure the facility remained profitable. Berl stated that REL would require collection from numerous local authorities to reach the 330,000-tonne target.

Waste volumes required for bailing

Renew Energy identified that waste volumes of 60,000 tonnes per annum would be required for a bailing facility to be run profitably. This means there would need to be more waste than is currently collected by several smaller local authority areas for one of these bailing facilities to be economical.

Marlborough District has just over 60,000 tonnes of municipal solid waste per annum going into landfills. For the bailing machine to be profitable to operate, it would require almost all the waste collected in the region and would only allow for minimal flows of waste out of the district. Other regions, including Queenstown Lakes District, Dunedin City and Buller, would all fail to meet the 60,000-tonne requirement.

Larger population centres like Christchurch are serviced by landfills owned by both local government and private companies, like the Kate Valley landfill in Canterbury.

Berl stated that “W-t-E would require the cooperation of both private businesses and the local authorities to commit to a loss of landfill revenue to support WtE and ensure that volumes would be enough to justify investment in a bailing facility.

Even in Christchurch, where landfill gate fees are high, in the absence of a high waste levy or ETS cost, landfills across the country will behave competitively and drive their gate fees down

until the bailing facility/waste-to-energy plant folds, then put them back up again.”

Landfill investment

Another essential factor to consider in adopting W-t-E is the actions of the large private waste companies and local authorities currently owning landfills. They are unlikely to send waste to a WtE incinerator unless it is a cheaper alternative to operating and maintaining their current landfill investments, providing them with revenue.

Christchurch accounts for a significant amount of the South Island’s waste. This waste is disposed of at Kate Valley Landfill, which is owned by Waste Management NZ and a group of Canterbury councils, who profit from its operation. They are unlikely to send their waste to a competitor unless it is economically advantageous. Kate Valley has an expected lifetime that will enable it to accept waste until 2040.

Berl concluded, “Given the size of the waste supply, for WtE to be successful, the support and commitment of the large waste companies and local authorities that control the majority of the waste supply are required.”

Landfill diversion equals employment displacement

Assuming that current recycling practices remain and that material sorting continues as it currently does, there should be minimal changes to employment in the waste disposal sector.
The change will likely be experienced in the current locations of these jobs. Where a council-controlled landfill currently disposes of approximately 50,000-100,000 tonnes per annum, employment is spread across several landfills, meaning a spread of landfill jobs across different
districts and regions. A WtE facility potentially takes up to 330,000 tonnes, concentrating employment around the facility. Those employees looking to stay in the waste industry
will likely be forced to relocate to continue working in the sector. In the absence of people willing to relocate, additional training will be necessary in the area around the WtE facility to meet the facility’s skills requirements.
While any WtE facility will directly create new jobs in its established location, it will also create indirect and induced benefits; these will be concentrated in the area of the WtE facility. However,
These benefits will be lost to the areas that lose jobs, resulting in a neutral outcome for the national economy.

The decision to move to W-t-E

In addition to price, local authorities and waste companies will also need to consider the WtE facility’s ability to remain operational throughout the contract and ensure that it can take all its waste. Political concerns of decision makers will also play into any decision for local authorities to move to WtE.

Control over waste

Transitioning to WtE and closing their landfills could potentially put local authorities in a position where they are dependent on the WtE operator or larger waste suppliers to the WtE facility, risking a loss of control.
The significance of maintaining a local landfill, supported and owned by the local authority, cannot be overstated. It provides a strong assurance that the authority will be able to ensure that its district or city can continue to dispose of its waste.

Supply of waste

Research reveals that building overcapacity WtE facilities has resulted in companies importing waste to fuel otherwise idle plants. An example of this is the Amager Bakke plant in Denmark. Consent requirements originally stipulated that waste must not be imported to fuel the plant. However, after the plant was commissioned, local waste volumes were unavailable to support the facility. Subsequently, this stipulation was removed to ensure supply and the plant’s economic viability. Denmark imported 1 million tonnes of waste in ??? to fuel the country’s 34 ??? Incinerators.

Ensuring a supply of waste.

As seen in Denmark, failure to ensure waste supply can lead to the importation of waste. The inability to run W-t-E plants at full capacity can also result in W-t-E companies raising their gate fees to compensate and remain economically viable.

If a W-t-E facility was forced to close for any reason, including lack of waste fuel, compliance breaches, breakdowns, etc., waste companies and local authorities committed to supplying the W-t-E facility could be left with limited disposal options.

W-t-E incineration relies on diverting waste away from existing landfill disposal, which could result in landfill closures; any reduction in disposal services could also result in waste suppliers facing higher waste disposal costs at alternative locations. These higher costs would then be passed to ratepayers, residents, and businesses. For example, suppose a waste company were to leave Kate Valley and instead support a W-t-E facility, which could not continue operating. In that case, there is a real risk that the waste company would need to return to waste disposal at Kate Valley. As a result, the supplier could face increased charges from the landfill operator.

 

For a W-t-E facility to be attractive to waste suppliers, it will need to obtain agreements for the minimum amount of waste required for the facility to continue to operate while also ensuring that its suppliers can continue to supply the waste volumes necessary for the duration of the

contract. This collaboration is essential but not easy to achieve.

As mentioned, acquiring the waste needed for W-t-E to work in the South Island requires collecting waste from multiple regions, multiple waste management companies and multiple local authorities to ensure a consistent supply of waste to the W-t-E facility. Any weak link undermines the plant’s viability. When considering a move to W-t-E, local authorities must also consider minimisation and recycling objectives.

Conversely, suppose waste companies and local authorities collect more waste than the W-t-E facility can process, and the W-t-E facility is unable or unwilling to accept additional waste. In that case, the local authority must find an alternative disposal method, which could be more costly than W-t-E incineration.

Ability to amend contracts for changes in supply

Another concern raised by Berl regarding waste supply during its research was that in order to keep the WtE facilities running, you need to “feed the beast.”
The report stated that local authorities and waste companies expressed concern that the 30-year supply contracts required by REL’s proposed Buller W-t-E facility would lock them into long-term supply contacts for waste volumes.
Given that most local authorities and waste management contracts for collection and disposal do not align with the W-t-E plant’s 30-year-plus lifetimes, it would be difficult for waste suppliers to agree to such extended timeframes without the ability to vary contracts.
Furthermore, the Waste Minimisation Act 2008 obligations and future changes in waste management regulations highlight the critical need for flexibility in local authorities’ waste management contracts. The inability to adapt to these changes could result in being locked into long-term agreements with W-t-E providers, potentially leading to the generation of waste solely to fulfil contractual obligations.

As noted above, if waste volumes fall below the breakeven point for the W-t-E facility and it’s forced to close, local authorities and waste companies will be required to find alternative disposal methods, possibly at short notice. The potential consequences of such a situation would be significant and likely involve the passing of rising costs on to ratepayers.

Political dimension

The Berl report stated “Local authority policy decisions can only partially be about costs. While prudent financial management is essential and valued by their constituents, other factors, such as environmental and reputational impacts, contribute to decisions.
For a number of local authorities, the decision to move to WtE incineration will ultimately fall on local councillors. Local councillors will need to consider the views of their constituents on the appropriateness
of WtE. The decision will balance waste disposal costs, flexibility to change if alternatives become available and environmental concerns.”