ECAN & WDC REQUEST FURTHER INFORMATION

SIRRL's resource consent lodgements

SIRRL lodged its resource consent application with the Waimate District Council (WDC) and Environment Canterbury (ECan) in September 2022. The application was returned due to a need for more fundamental information, including a cultural impact assessment report (CIA). SIRRL relodged its consent application in late November 2022, just days before new RMA regulations came into effect. This means any application lodged after December 2, 2022, would require consenting authorities to consider greenhouse gas emissions. 
SIRRL’s second application was again returned for a lack of information, including a site-specific CIA.
SIRRL objected to this decision, and independent hearing commissioner Rob Enright upheld the objection. Enright’s decision required both ECan and WDC to continue processing SIRRL’s second application without a site-specific CIA.

Ecan information request.

Since commencing the evaluation of SIRRL’s second application, ECan and WDC have requested more information from the applicant. 

ECan’s request includes the following:

The Canterbury Regional Council (CRC) External Air Quality Expert has reviewed the application; the detailed assessment is attached in Appendix 1. The information required is to allow CRC and other relevant parties, including potential submitters, to have a better understanding of the processes proposed and the effects on Air Quality.

In summary, the following information is required: 

a. Please provide comprehensive justification of the guaranteed emission limits.
b. Please provide a detailed plant design, including the combustion chamber design.

suitability to the waste stream and impact on emissions.
Less plastic material (product stewardship/changing packaging mix, material bans,
increased recycling capability).
Changing makeup of construction waste as materials recovery is driven through
Building Act, RMA/NBA and WMA changes.
Please provide details (location, class of landfill) on the proposed disposal for bottom
ash and vitrified fly ash until markets are established for beneficial use.
Please provide evidence that an existing authorised disposal pathway exists for the bottom
ash and vitrified fly ash, e.g., evidence that the ash meets the waste acceptance criteria
at an authorised landfill.
Please provide examples and details of successful and beneficial use of fly ash and bottom
ash.
Please set out the contingency arrangements for the management of air pollution
control residues/fly ash if the vitrification process fails or is temporarily offline?
Please address the impact of reduced feedstock quantity on the operation of the facility.
Please advise where the targeted feedstocks are currently going and why there is a

need for something new?

The request included an appendix from Dr Emily Wilton, who is peer-reviewing PDP’s Air Quality Assessment report. In the appendix, Dr Wilton stated that there is a lack of cohesion between experts used to prepare Technical report 1, the Operational and Technical Overview report completed by Babbage Consultants and technical report 5, the Air Quality Assessment report completed by Pattle Delamore Partners (PDP).

Dr Wilton went on to state that the inconsistencies between the two reports was problematic when providing an assessment.

Read the full ECan information request below.

Waimate District Council further information request.

Waimate DC made a s88 request letter for more information from SIRRL on September 13, 2023. The letter requests more information regarding the following:

  • Site and building plan: Parking allocation
  • Transport: gates and queue space.
  • Noise: number of truck movements discrepancy
  • Visual impacts: Kahikatea planting
  • Economic: resulting impacts on Kate Valley, Victoria Flat, and Green Island landfills from waste diversion.
  • National Policy Statement on Highly Productive Land: A minimum of 25 samples is required; only 6 are provided.
  • Cultural Impact Assessment: No site-specific CIA was provided.

The s88 letter failed to request further information regarding proposed activities outside the district plan. These activities include the following:

  • Building sizes and setbacks over the 10-metre threshold.
  • Diesel storage capacity of 100,000 litres over the maximum 3,000 litre threshold.
  • Storage of numerous hazardous substances over the allowable thresholds.
  • Storage of hazardous materials in a flood zone.
  • Building within a flood zone.
  • Maximum daily truck movement threshold exceedances.

Waimate DC information request is insufficient

Why Waste Waimate believe that the information request from WDC is insufficient? Questions about car parking allocations and native tree planting seem trivial when considering this proposal’s significant scale and potential impact. 

The s88 letter failed to request further information regarding proposed activities outside the district plan. These activities include the following:

  • Building sizes and setbacks over the 10-metre threshold.
  • Diesel storage capacity of 100,000 litres over the maximum 3,000 litre threshold.
  • Storage of numerous hazardous substances over the allowable thresholds.
  • Storage of hazardous materials in a flood zone.
  • Building within a flood zone.
  • Maximum daily truck movement threshold exceedances.

Economics

WDC questioned the economic effects of diverting waste away from Dunedin, Central Otago, and Canterbury landfills yet did not mention how the change in waste management practices might impact the Waimate District. For instance, SIRRL’s proposal relies on the company forging agreements with waste management companies and councils to divert waste from South Island landfills. Diverting waste away from landfills impacts their ability to operate, which may result in closures. This could result in districts like Waimate having to transport waste further, impacting ratepayers. Also, if the proposed incinerator were to get consent and establish agreements with councils to acquire the required waste but were to close due to economics, compliance breaches, regulation changes, etc., this would result in councils having to renegotiate with waste management companies, which again would likely impact ratepayers.

Transport

WDC mentions gates and queue space, but other than questioning hourly truck movement discrepancies; they fail to ask with any detail about the proposed activity of 136 heavy truck and trailer movements each day and the associated effects on neighbouring properties. The District Plan has a maximum allowance of 12 per day; the Project Kea proposal suggests 12 per hour. These movements will likely affect neighbouring properties as the plant will operate 24 hours a day, 365 days a year.

Building size, setbacks.

WDC has not requested further information regarding building sizes and setbacks, even though SIRRL’s plans exceed the maximum allowances within the District Plan.

Read the full Waimate District Council informaton request below.